Home Repertory Dessin et Construction Converted rail track prolonging the cycle and walking path and footbridge
- Projet
Converted rail track prolonging the cycle and walking path and footbridge
- Architecte
Dessin et Construction
- Programe
- Prolongation of the railway path to the Delta multimodal station (length 1.2 km). Creation of a footbridge over the chaussée de Watermael (length 60 m, height 8 m) and modification of the status of the E411 motorway (conversion of the hard shoulder into a green cycling and walking path, reduction of the widths of the lanes and modification of the anti-noise devices).[...]
- Typology
- Landscape, urban areas
- Status
- Built
- Year of conception
- 2005
- Year of delivery
- 2010
- Client
- Projet: Bruxelles-Environnement (IBGE) - Exécution: SPFMT
- Total budget
- 5 312 000 euros HTVA
- Per square meters
- 265 euros / m²
- Stability
- Dessin et Construction & GEI
- Special techniques
- Éclairage : Véronique Claeys
- Landscape
- Dessin et Construction & Gaspard Jedwab
- Others
- Dessin et Construction (design et mobilier)
chaussée de Watermael/ rue J. Cockx
1160 Bruxelles (Auderghem)
Plus d'informations
Dessin et Construction
Projets
- Renewal around the Church of Saint Vaast2018–2023Fontaine-L'Evêque
- Sambre quays and station square in Charleroi2017–2023Charleroi
- Heer's place2013–2018Hastière
- BRUSSELS CRUISE TERMINAL2013–2018Bruxelles
- Let's color Charleroi, North Plaza2012–2012Charleroi