Home Repertory Syntaxe Architects PFIZER R&D CENTER
- Projet
PFIZER R&D CENTER
- Architecte
Syntaxe Architects
- Programe
- Construction of an extension to a pilot plant, with production lines, R & D laboratories (classified BL3 +), storage areas and offices
- About
- The construction of the extension (which triples the capacity of the existing pilot plant) was carried out while the factory was in full use. The building was designed and built in a record 18 months schedule. Research Laboratory (unique in Belgium and even in Europe by its size and layout) allows the scientifics to work on vaccines linked with emerging diseases (fatal for humans and animals).[...]
- Typology
- Scientific research laboratory
- Status
- Built
- Year of conception
- 2009
- Year of delivery
- 2011
- Client
- PFIZER ANIMAL HEALTH
- Total budget
- 22.000.000
- Per square meters
- 5.000
- Area
- 4.400
Rue Laid Burniat, 1
1348 Louvain-La-Neuve
Plus d'informations
Syntaxe Architects
Projets
- Sart-Tilman veterinary clinic2014 –2019Liège (Sart-Tilman)
- WYETH HEADQUARTER2008–2010Louvain-La-Neuve
- RTBF BROADCASTING CENTER2008–2011Liège
- JODOIGNE POLICE STATION2008–2012Jodoigne